Loading...
HomeMy WebLinkAboutJDE Eng - PSA - Design of Gravity Sanitary Sewer Main Ext.-12/16/2013Mayor BUCK CLARK COUNCIL MEMBERS DAVID JONES - YTrard 1 CAROLYN COLE Ward 2 I-IAROLD GETTY ward 3 QUENTIN HART Ward 4 RON WELPER Ward 5 BOB GREENWOOD At -Large STEVE SCHMIPI ,1t -Large CITY bF= WATER , r°F. IOWA COMMUNITY PLANNING AND DEVELOPMENT 715 Mulberry Street a Waterloo, Iowa 50703-5783 e (319) 201-4366 Fax (319) 291-4262. NOEL C.ANDERSON, Conununl7' Planning &Raw/o meurDircror CITY OF WATERLOO Council Communication City Council Meeting: December 16, 2013 Prepared: December 11, 2013 Dept. Head Signature: Noel Anderson, Community Planning & Development Director # of Attachments: 1 SUBJECT: Approve a resolution authorizing the Professional Services Agreement with JDE Engineering for the Design of Gravity Sanitary Sewer Main Extension for the expansion of the Northeast Industrial Park, not to exceed $33,950, and authorize the Mayor and City Clerk to sign and fully execute all necessary documents. Submitted by: Noel Anderson, Community Planning & Development Director Recommended City Council Action: Adopt resolution and authorize signatures as requested. Summary Statement: The City of Waterloo is continuing to see development and requests for development in the Northeast Industrial Park area. This agreement will design the sewer extensions needed for the development of the land to the west of the existing industrial park (city -owned land) for additional development needs. Expenditure Required: $33,950 Source of Funds: TIF and sewer bond funds Policy Issue: Economic Development Alternative: NA Background Information: The City developed the Northeast Industrial Park in 1995, and has worked with several businesses to locate there. This will allow for continued development. CITY WEBSITE: wwwci.waterloo.ia.us WE'RE WORKING FOR YOU! An Equal Opportunity/Affirmative Action Employer JDE ENGINEERING (319) 464-7913 402 E. 4th Street, Suite 101, Waterloo, IA 50703 jdeeng@ipctel.net December 2, 2013 DESIGN OF GRAVITY SANITARY SEWER MAIN EXTENSION NORTHEAST INDUSTRIAL PARK EXPANSION NORTH OF MARTIN LUTHER KING JR. DRIVE AND WEST OF NORTHEAST DRIVE WATERLOO, IOWA PROFESSIONAL SERVICES AGREEMENT WHEREAS, the City of Waterloo, Iowa ("City") desires to expand the Northeast Industrial Park to continue to promote development of industrial activities in northeast portion Waterloo, and WHEREAS, JDE Engineering, PLC ("Consultant") of Waterloo, Iowa desires to provide professional engineering services related to the development of a gravity extension to the sanitary sewer system in the area, NOW THEREFORE, it is mutually agreed that this Professional Services Agreement shall consist of the following: SCOPE OF SERVICES • Obtain survey information for the sanitary sewer extension area, • Obtain existing and proposed utility information, • Develop preliminary plan set documents for the sanitary sewer extension using aerial photography and survey information, • Conduct a field investigation to document the location of existing features within the area of interest, • Obtain soil boring information in the area of the proposed sanitary sewer extension, • Incorporate existing feature information into plan set documents, • Design the gravity sanitary sewer extension, • Develop a plan for use of a temporary cofferdam to construct the sanitary sewer across an existing creek in the area, • Develop an erosion control plan for the project, 1 • Obtain permitting from the Iowa Department of Natural Resources related to the NPDES storm water program, gravity sanitary sewer extension, and construction within the floodplain, • Compile a list of estimated quantities for use in bidding of the project to contractors, • Develop final plan set documents for bidding purposes, and • Develop a final specification book for bidding of the project. II. TIME OF BEGINNING AND COMPLETION The project shall begin following approval of the City Council and execution of this agreement by the Mayor of the City of Waterloo. Final plans and specifications for this project will be submitted to the City approximately 14 weeks following the approval of this agreement. Below is an anticipated schedule for development of the project: • Approval of the Professional Services Agreement December 2013 • Obtain Field Survey Information January 2014 • Develop Preliminary Plans and Specifications February 2014 • Develop Final Plans and Specifications March 2014 111. COMPENSATION The fee for the work detailed under "Section I. Scope of Services" is based on anticipated time -and - materials necessary to complete the work. Surveying services will be performed under this contract by Great Plains Survey of La Porte City, Iowa. Soil borings information will be obtained by Terracon Consultants, Inc. of Cedar Falls, Iowa. Civil design services for the project will be performed by JDE Engineering, PLC of Waterloo, Iowa. Structural design services will be provided by Select Structural Engineering of Waterloo, Iowa. The cost associated with each portion of the work is summarized below: Design Survey Soil Borings Structural Design Civil Design 5 4,000 $ 1,850 5 2,500 $ 25,600 The total cost related to this proposal is estimated to be $33,950. This fee is considered a maximum not -to -exceed cost. IV. TERMS AND CONDITIONS The attached Terms & Conditions are considered part of this agreement. 2 IN WITNESS WHEREOF, the parties hereto have executed this Professional Services Agreement as of the dates shown below: JDE ENGINEERING, PLC 6cia_L., 13 . Th....L. /z - L.- i'l Ilis Jim D. , P.E. Date CITY OF WATERLOO, IOWA 1 / 12_1Co-13 Ernest G. Clark, Mayor Date 3