HomeMy WebLinkAboutAECOM CO. #5 -2/13/2017A=COM ORIGINA L February 7, 2017 Mr. Keith Kaspari Waterloo Regional Airport 2790 Livingston Lane Waterloo, IA 50703 AECOM 515 323 7919 tel 500 SW 7th Street 515 244 4803 fax Suite 301 Des Moines, Iowa 50309 www.aecom.com RECEIVED FEB 0 9 2017 SUBJECT: Rehabilitate Taxiway A and Runway 12/30 Crack Sealing Waterloo Regional Airport Waterloo, Iowa FAA AIP Project No. 3-19-0094-44 AECOM ID No. 60440546 Dear Mr. Kaspari: Transmitted herewith for City Council consideration, are four (4) copies of Change Order No. 5 (Final) for the above mentioned project. This charge order adjusts all contract quantities to match field measurements for quantities installed. This Change Order increases the final contract amount by $7,122.67. The original contract amount was $861,208.50. This final change order results in a final contract amount of $858,030.02. Please return three (3) fully executed copies to our office for distribution to FAA and the Contractor. If you have any questions or require any additional information, please contact our office at your convenience. Yours sincerely, David B. Hughes, P.E. Enclosure: As noted cc: Mr. Doug Schindel, AECOM P:160440546 ALO Twy A CRS1600_Construction_Suppor1690Punch-List-Closeout1KK020717.Twy A CO No. 5 Final.ltr.doc CHANGE ORDER NO. 5 (FINAL) Owner Waterloo Regional Airport, City of Waterloo, Iowa Date December 10, 2016 Project Rehabilitation of Taxiway A Owner's Contract No. FAA AIP Project No. 3-19-0094-044 Contractor Aspro, Inc. Date of Contract Start September 12, 2015 You are directed to make the following changes in the Contract Documents. Description: ITEM NO. DESCRIPTION UNIT UNIT PRICE QUANTITY AMOUNT 2 PAVEMENT REMOVAL SY $ 5.30 (22.69) $ (120.26) 3 JOINT AND CRACK REPAIR LF $ 2.40 (1,728.0) $ (4,147.20) 4 COLD MILLING SY $ 4.95 505.7 $ 2,503.22 5 EMBANKMENT IN PLACE CY $ 25.00 (49.5) $ (1,237.50) 7 INSTALLATION AND REMOVAL OF SILT FENCE LF $ 2.95 (1,250.0) $ (3,687.50) 8 EROSION CONTROL MATTING SY $ 1.45 (2,573.1) $ (3,731.00) 9 BITUMINOUS SURFACE COURSE TON $ 85.25 (137.05) $ (11,683.51) 10 BITUMINOUS TACK COAT GAL $ 2.75 (915.0) $ (2,516.25) 12 RUNWAY AND TAXIWAY MARKING SF $ 1.85 (44,539.0) $ (82,397.15) 14 REFLECTIVE MEDIA (TYPE I, GRADATION A) LB $ 1.00 2,817.0 $ 2,817.00 15 SEEDING AC $ 3,750.00 (0.03) $ (112.50) 16 TOPSOILING (FURNISHED FROM OFF THE SITE) CY $ 40.00 (424.7) $ (16,988.00) 17 MULCHING SY $ 0.60 (1,254.7) $ (752.82) 18 NO. 8 AWG, SKV, L-824, TYPE C CABLE, INSTALLED IN TRENCH DUCT BANK OR CONDUIT LF $ 1.10 (1,633.0) $ (1,79630) 19 NO. 6 AWG BARE COPPER COUNTERPOISE WIRE, INSTALLED IN TRENCH, ABOVE THE DUCTBANK OR CONDUIT LF $ 1.20 (595.0) $ (714.00) 20 NON-ENCASED ELECTRICAL CONDUIT, 2 -INCH SCHEDULE 40 PVC LF $ 2.50 (694.0) $ (1,735.00) 22 L-861T(LED)TAXIWAY EDGE LIGHT - LED EA $ 950.00 (2.0) $ (1,900.00) 150 ADDITIONAL RUNWAY AND TAXIWAY MARKING SF $ 1.60 84,575.9 $ 135,321.44 TOTALS $ 7,122.67 Rehabilitation of Twy A CO -5 (FINAL) Project No — 60340634 & Crack Sealing Rwy 12/30 1 Reason for Change Order: Item 2, Pavement Removal — Item adjusted to match actual field measured quantity. Item 3, Joint and Crack Repair — Item adjusted to match actual field measured quantity. Limits of joint and crack repair were adjusted in the field to allow for continued operation of aircraft across Runway 12/30 to utilize Taxiway C to access Runway 18 during construction. Item 4, Cold TR:in^g - Item adjusted to match actual field measured quantity. Item 5, Embankment In Place — Item adjusted to match actual field measured quantity. The limits of disturbance outside of the edge of pavement was reduced after pavement final placement was completed. Item 7, Installation and Removal of Silt Fence — Item was not used. Area was stabilized without the need for silt fence as matting was placed immediately after grading was completed. Item 8, Erosion Control Matting — Item adjusted to match actual field measured quantity. Item 9, Bituminous Surface Course — Item adjusted to match actual field measured quantity. Item 10, Bituminous Tack Coat - Item adjusted to match actual field measured quantity. Item 12, Runway and Taxiway Marking — New price was negotiated for this item as part of Change Order No. 4. All quantity for Runway and Taxiway Marking was paid at the new price in Line Item 150, Additional Runway and Taxiway Marking. Item 14, Reflective Media (Type I, Gradation A) — Item adjusted to match actual field measured quantity. Additional pavement marking was added to the project as part of Change Order No. 4. Item 15, Seeding — Item adjusted to match actual field measured quantity. Item 16, Topsoiling (Furnished from Off the Site) — Item adjusted to match actual field measured quantity. Importing of Topsoil from off the site was limited. Item 17, Mulching - Item adjusted to match actual field measured quantity. Item 18, No. 8 AWG, 5kV, L-824, Type C Cable, Installed in Trench, Duct Bank or Conduit - Item adjusted to match actual field measured quantity. Item 19, No. 6 AWG Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank or Conduit - Item adjusted to match actual field measured quantity. Item 20, Non -Encased Electrical Conduit, 2 -Inch Schedule 40 PVC - Item adjusted to match actual field measured quantity. Item 22, L-861 T(LED) Taxiway Edge Light- LED - Item adjusted to match actual field measured quantity. Item 150, Additional Runway and Taxiway Marking - Item adjusted to match actual field measured quantity. New price was negotiated for this item as part of Change Order No. 4. All quantity for Runway and Taxiway Marking was paid at the new price in Line Item 150, Additional Runway and Taxiway Marking. Rehabilitation of Twy A CO -5 (FINAL) Project No — 60340634 & Crack Sealing Rwy 12/30 2 CONTRACT PRICE Original: $ 861,208.50 Previous C.O.s (DEDUCT): $ 10.301.15 This C.O. (ADD): $ 7,122.67 Contract Price with all approved Change Orders: $ 858,030.02 CONTRACT TIMES (Calendar Days) To substantial To fmal completion completion Original: Previous C.O.s (ADD): This C.O. (ADD): REVISED: 90 0 0 90 It is agreed by the Contractor that this Change Order includes any and all costs associated with or resulting from the change(s) ordered herein, including all impact, delays, and acceleration costs. Other than the dollar amount and time allowance listed above, there shall be no further time or dollar compensation as a result of this Change Order. THIS DOCUMENT SHALL BECOME AN AMENDMENT TO THE CONTRACT AND ALL STIPULATIONS AND COVENANTS OF THE CONTRACT SHALL APPLY HERETO. RECOMMENDED: By: e) -&-- Engineer (Authorized Signature) APPROVED: By: Owner (Authorized Signature) ACCEPTED: By: m G7 1-4 )% Cont ctor (Authorized Signature) )Lt. Date Date //1/1-- // Date Rehabilitation of Twy A CO -5 (FINAL) Project No - 60340634 & Crack Sealing Rwy 12/30 3