HomeMy WebLinkAboutIowa Department of Natural Resources-Waste Water Section-4/26/2010Iowa Department of Natural Resources Wastewater Section Construction Permit Application SEWAGE TREATMENT AGREEMENT INSTRUCTIONS This agreement must be executed for all projects where construction and sewage treatment will be provided by different parties; i.e., a private subdivision connecting to a municipal system. This agreement must be executed by the parties who are owners at the time the permit is issued, regardless of whether title to the proposed construction project will be transferred after completion of the project. This agreement is not necessary when a contract for sewage treatment already exists; i.e., service contracts between municipalities. However, the Department of Natural Resources must be informed in writing that the contractual agreement does exist. APPLICANT ENGINEER OWNER The Fortes Group FIRM Ament, Inc ADDRESS 12207 Illinois Road Foot Wayne, IN 46814 Or ADDRESS 3628 University Avenue Waterloo, Iowa 50701 REPRESENTATIVE Dirk M. Beck TELEPHONE 317-413-9104 PROJECT OFFICER Larry Buchholz TELEPHONE 319-233-1323 PROJECT IDENTIFICATION The Preserve at Crossroads OWNER AND SYSTEM RECEIVING WASTES City of Waterloo CERTIFICATE I am the authorized representative of the owner identified above and state that the proposed sanitary sewerage facilities shall be constructed in accordance with the plans and specifications and all wastes contributed by this project shall be discharged to the treatment system identified above. SIGNATURE_ TITTLE - (-cid%sf %,Cfi•ij DATE 4i -1-/O /4-7VP AGREEMENT TO PROVIDE SEWAGE TREATMENT I am the authorized representative of the owner of the system identified above and state that the connection of the proposed sanitary sewerage facilities identified above is approved by the owner, and that the owner accepts responsibility for providing adequate treatment of all wastes contributed by this project, in accordance with the provisions of Chapter 455B. Code of Iowa, and the rules of the Department Natural Resources. is agreement shall not be construed in any way to affect any local ordinances, sewer service agreem t , or fee stems iv ter o be een the parties. ` /if/BA SICINATU TYPED OR PRINTED%NAME 6 -N,51 -V . (-L 1 1I -LE ��Y" PHONE NUMBER (1615,2911--/f361 DATE 4/ (20o Exhibit 8A Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE A. General Information APPLICANT ENGINEER OWNER The Fortes Group FIRM Ament, Inc ADDRESS 12207 Illinois Road Fort Wayne, IN 46814 ADDRESS 3628 University Avenue Waterloo, Iowa 50701 REPRESENTATIVE TELEPHONE Dirk M. Beck 317-413-9104 PROJECT OFFICER TELEPHONE Larry Buchholz 319-233-1323 f PROJECT IDENTIFICATION The Preserve at Crossroads ESTIMATED START DATE * March 2010 ESTIMATED COMPLETION DATE December 2010 PLEASE RESPOND TO ALL QUESTIONS YES NO 1. Has an engineering report, facilities plan or other information previously been submitted for this project? ❑ ❑ If Yes=> PROJECT IDENTITY DATE SUBMITTED 2. Does the project and construction permit application, as submitted, follow the recommendations, design loadings, construction schedule, permit limits. and conclusions of the approved engineering report or facilities plan? If No=> Provide the design basis and technical information justifying all changes. 3. Are there three complete sets of plans and specifications accompanying this application? For a minor gravity sewer extension within the meaning of 455B.183.3 Code of Iowa and Design Standard 11.1, two complete sets will be adequate for expeditious approval. For more complex projects. three sets of plans and specifications may be requested. 4. Are approved standard specifications a part of this application? ❑ ❑ _ ❑ L-] If Yes=> APPROVED STANDARD SPECIFICATIONS OF (municipality or firm) City of Waterloo DATE APPROVED 5. Does each set of plans and specifications or engineering report accompanying this application contain a "professional engineering seal" executed in conformance with 542B.16, Code of Iowa? If No=> Processing will be delayed pending receipt of applicable design schedules and certified plans, specifications or engineering report. G. Is this a joint wastewater and water supply project? If Yes=> A construction premit application for the water supply project should be submitted separately to the Water Supply Section. A water supply permit fee may be required. 7. Is the applicant to provide treatment of effluent resulting from this construction? If No=> A Sewage Treatment Agreement (DNR Form 29) executed by the authority providing treatment oust accompany this application. 8. is a new or amended operation permit necessary to use the facilities described in this application? If Yes=> A new or amended permit to operate may be requested prior to the receipt of a construction permit. 9. is any waterline located within 10 feet; or any private or public well, lake; or public recreation area located within 400 feet of the proposed construction? If Yes=> Identify and locate the facility(s) relative to the proposed construction. 10. Will construction inspection be conducted by a licensed engineer employed by the applicant? a1 a ❑ ❑ ■ X P1 ❑ >< a E) ❑ If No=> NAME OF ENGINEERING FIRM CONDUCTING INSPECTION 11. Will this project utilize CWSRF loan funds? ❑ a CERTIFICATION APPLICANT 1 certify that I am the authorized representative of the owner and state that the project identified above is approved by the owner. .,-----information r — c.....----11— 9—/O ENGINEER l certify that all aspects of design included in this application conform to applicable standards contained in Chapter 567 IAC 64, or that an explanation and justification for any proposed variations from such standards is attached. 1 am familiar with the contained in this application, and to the best of my knowle e, such information is complete and accurate. SIGNATURE DATE SIGN ' DATE -- \. r 1 / 1 0 * Estimated Construction Start Date: Complete applications ust be submitted aast 120 days in advance of the date for starting construction in accordance with Rules 567 IAC 60.4 and 64.2 PLEASE COMPLETE THE SCHEDULE CHECKLIST ON THE FOLLOWING PAGE OF THIS FORM DNR form 28A (Apr 04) Exhibit 8A Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE A, General Information DOCUMENT CHECKLIST Identify all categories included in this project. Also, identify schedules attached to this application. INCLUDED IN SUBMITTAL SCHEDULE TITLE ATTACHED PROJECT DATE B Collection system C Lateral Sewer Extension D Trunk & Interceptor Sewer E Wastewater Pump Station F Treatment Project Site Selection G Treatment Project Design Data Hl Schematic Flow Diagram H2 Treatment Process Loading and Removal Efficiency 113 Mechanical Plant Reliability T Screening, Grit Removal and Flow Measurement J Septic Tank System K1 Controlled Discharge Pond K2 Aerated Pond K3 Anaerobic Lagoon L Setting Tanks M Fixed Film Reactor — Stationary Media N Rotating Biological Contactor O Aeration Tanks or Basins P Gas Chlorination Q Sludge Digestion and Holding RI Sludge Dewatering and Disposal R2(A & B) Low Rate Land Application of Sludge R3 Land Application of Sewage Sludge (To be developed) S Land Application of Wastewater (To be developed) Sewage Treatment Agreement Identify any categories included in this project which are not provided in the above list of schedules, DNR form 28A (Apr 04) 542-3129 Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE B, Collection system DATE PREPARED 3-24-2010 DATE REVISED PROJECT IDENTITY The Preserve at Crossroads DNR USE PROJECT NO. PERMIT NO. 1. Identify proposed construction which is subject to flooding and explain what is proposed to prevent water from entering the system. If no portion is subject to flooding, state none. Segment none Flooding Protection *2. Indicate hydraulic capacity of: I) the nearest downstream main or interceptor, 2) the nearest downstream lift station, and 3) all downstream segments where flow restriction may occur. Indicate the source and accuracy of numerical data. Location Design capacity, MGD Peak Hourly Dry weather Flow MGD (actual) Peak Hourly Wet Weather Flow MGD (actual) Segment Segment Segment RIVE 0.7(3 0,430 *3. Identify treatment facility, the design loadings and present raw waste loadings. Indicate source and accuracy of numerical data. Facility name and number Waterloo Wastewater Treatment facility #0790001 Facility Loading Design Average Wet Weather (actual) Peak Hourly Wet Weather (actual) MGD #BODS/day 39.2( 2g.a0 24. 53 31,roo G0_* 17, 000 ± Provide projected design loading increase, which will be added to this facility as a result of this project. Design Loading Initial Design Year (2010 ) Residential service area G. yz Acres 64 V2 Acres Population 0 Persons 144 Persons Flow (100 GPCD) 0 GPD 14400 GPD BOD5 (0.17 #/d/cap) 0 #/day 24.48 4/day Industrial service area 0 Acres 0 Acres Rated flow 0 GPD 0 GPD BOD5 0 #/day 0 #/day Other 0 Acres 0 Acres Rated Flow 0 GPD 0 GPD BOD5 0 #/day 0 #/day Total BOD5 0 4/day 24.48 #/day Total Flow 0 GPD 14400 GPD Peak Hourly Flow 0 GPD 36000 GPD Include a written explanation of items 2 and 3 if the sewer system and/or treatment facility are overloaded. Iowa Department of Natural Resources Wastewater Section Construction Permit Application SCHEDULE C, Lateral Sewer Extension DATE PREPARED 4-15-2010 DATE REVISED PROJECT IDENTITY The Preserve at Crossroads DNR USE PROJECT NO. PERMIT NO. I. Design Basis Residential service area Population 0 Flow (100 GPCD) 0 Initial 6.42 Design Year ( Acres 6.42 Persons 144 GPD 14400 BOD5 (0.17 #/d/cap) 0 #/day 24.48 Industrial service area NA Acres NA Rated Flow GPD BOD5 #/day Other NA Acres NA Rated Flow GPD BOD5 #/day Total BOD5 0 #/day 24.48 Total Flow 0 GPD 14400 Peak Hourly Flow 0 GPD 36000 2. Pipe Diameter Material Joint Minimum Slope Maximum Manhole Space Total Sewer Length Maximum Cover Minimum Cover 8 Inch ASTM D 2680 ASTM D-3212 1.4 300 722 12 10 ft. ft.. ft. ft. 10 Inch ft. ft. ft. ft. 12 Inch Acres Persons GPD #/day Acres GPD #/day Acres GPD #/day #/day GPD GPD % ft. ft. ft. ft. 3. Construction specifications (indicate ASTM No. or other standard included in the specifications). A brief description is required in each part. A. Bedding class Class B B. Pipe laying ASTM -D2321-00 C. Compaction ASTM -D2321-00 D. Manhole ASTM C-478 E. Specified maximum Infiltration/exfiltration rate 200 GPDPMPI F. Infiltration/exfiltration test procedures City of Waterloo G. Alignment & grade test procedures (1) During construction: Stake & batter board Laser X (2) After construction: Lamping X Other H. Deflection test procedures City of Waterloo 4. Are detailed manhole drawings included: Yes Si No ❑ Typical flame and cover assembly Neenah R-1643 Are manhole covers nonvented: Yes ® No Manhole diameter 48 Manhole opening diameter 24 in. 5. Minimum sewer & water main separation: Horizontal Are specifications included? No in. Material Concrete/Precast 10 ft. Vertical l8 m. 6. Stream, road, or railroad crossing protection City of Waterloo Are specifications included? No DNR form 28C (Nov 00) 542-3096 IOWA DEPARTMENT OF NATURAL RESOURCES Wastewater Disposal System Construction Permit Application Fee Form OWNER: _The Fortus Group ADDRESS: 12207 Illinois Road Fort Wayne, IN 46814 PROJECT IDENTIFICATION: _The Preserve at Crossroads $100 Fee enclosed 32-3202 IDNR Cashier's Use Only 0945-542-NPDE-0570 Please sign and return this form with a check or money order payable to "Iowa Department of Natural Resources". Place it and the check or money order on top of other Construction Permit Application documents. Effective beginning July 1, 2006, Applications for Construction Permits for wastewater disposal systems required by Iowa Code 455B.173 and rules in Iowa Administrative Code 567 IAC 64, must be accompanied by the fee required by Iowa statute (HF2540). The fee is $100 for each application, regardless of project size and project type including sanitary sewers, pump stations, treatment units or a combination thereof. The fee shall be submitted with the certified engineering documents necessary to apply for a construction permit (plans, specifications and related application schedules A, F, and G as well as the appropriate schedules identified on page 2 of Schedule A). The construction permitting process is initiated as planning for construction begins. Planning coordination and submittal of preliminary engineering reports or facility plans precedes submittal of technical documents necessary to constitute a construction permit application. The application fee is not necessary when submitting a planning document but must accompany construction permit application documents. A fee should accompany each permit application received on or after July 1, 2006. Failure to submit a fee with the application may delay the processing of a construction permit. If you have any questions regarding the application fee, please contact Wayne Farrand at 515/281-8877 or wayne.farrand rnidnr.state.ia.us Signature of owner or representative Telephone or email contact 3/7 Li/ 3 — T/c76( Send with application to: Iowa Department of Natural Resources. WasteiN ater Construction Section Wallace State Office Building 502 East 9th Street Des Moines, IA 50319 CITY OF WATERLOO, IOWA CHANGE or EXTRA WORK ORDER NO. 1 PROJECT: F.Y. 2010 ASPHALT OVERLAY PROGRAM CONTRACT NO. 771 Date Prepared: April 14, 2010 AMOUNT: $98,584.83 INCREASE TO: Aspro, Inc. , Contractor You are hereby ordered to make the following changes from the plans and specifications or perform the following extra work on your contract dated March 1, 2010. A. Description of change to be made or extra work to be done: Add work in Black Hawk County on Balsam Street and Juniper Drive. B. Reason for ordering change or extra work: The City is overlaying Balsam Street within the city limits. The County wants to overlay the rest of Balsam Street and Juniper Drive outside of the city limits. The County will reimburse the City for the cost of construction. C. Settlement for cost of work to be made as follows: Compensation to be as shown on the attached sheet. NET INCREASE $98,584.83 CITY OF ERLOO BY: / (� ayor (d ASPRO, INC. Date CONTRACTOR BY: / n (7 Date �rn��(v PRINTED NAME: M7/Li ,7/q/rOK/ 4' // b.0 Our Date TITLE: /64ri ,41 4 /)J APPROVED: 2-0/ City Engineer Date 1-1..-•.,.,...a— 0 0 �l 0 0 CT 0 0 v, 0 0 a 0 0 w 0 0 N — 0 0 .-• H til trJ FE1 TOTAL ESTIMATE TRAFFIC CONTROL UNIVERSAL MH ADJ. RING OR EQUAL HMA (1,000,000 ESAL) BASE/INTERMEDIATE, 3/4" MIX HMA (1,000,000 ESAL) SURFACE, 1/2" MIX , NO FRICTION REQD. CRACK AND SEAT MILL WEDGE (USE EXISTING CASTING) REMOVE AND REPLACE E -1-C DESCRIPTION CONTRACT #771 CHANGE ORDER #1 (COUNTY WORK -BALSAM ST. AND JUNIPER Dit) EACH TON , J O Z SY rIl x [=f x o 0 7.00 424.50 376.00 w 0 La w w W 2.00 2.00 QUANTITY TOTAL cn 9 O O $ 540.00 $ 97.40 69 'JD oo �7 O 69 N O U 69 N 0 — O O O $ 2,700.00 UNIT PRICE ASPRO $ 98,584.83 $ 750.00 $ 3,780.00 69 P -' w A p' La O 69 w J _ ..-. '-' N O $ 6,177.33 69 ? 0 N O O O 69 U a 0 O O O TOTAL EST. ASPRO